Summerfest

Summerfest

Milwaukee, WI Commercial Industrial

Photo Gallery

Video

Milwaukee’s stormwater and flooding issues have been a major concern for the Milwaukee Metropolitan Sewage District MMSD and many local residents. With the World’s largest music festival, Summerfest, at the Milwaukee World Festival grounds, the staff wanted to take steps to help combat the flooding so they can focus on the festival not the weather.

One of those steps was installing Spancrete RePlenish precast pervious paving system into the parking lot and sidewalks of their headquarters in spring of 2015. RePlenish is designed to let the water return directly to the ground, significantly reducing the pressure on Milwaukee’s stormwater system.

This application of RePlenish has a water infiltrate of 500 inches per hour. The parking lot is laid out in a specific pattern to help maintain optimal efficiencies of this product. The asphalt/parking lot is sloped slightly to the center where the RePlenish is located allowing all the water to run towards the system. Designing the parking lot in this fashion is an efficient and cost effective method for RePlenish.


RePlenish

PROJECT HIGHLIGHTS

  • 500 inches per hour
  • Reduce flooding

PRECAST Products

WE BUILT THAT™ TEAM

General Contractor:J.H. Findorff and Son Inc.

LOOKING TO DESIGN WITH PRECAST?

Connect with a Spancrete precast specialist to learn more about designing your next structure using the safest, most cost effective and durable building product. You'll be able to upload drawings related to your project.