Double Tee Installation at Water Utility Garage in Stevens Point, WI

Projects

Double Tee Installation at Water Utility Garage in Stevens Point, WI

Spancrete is proud to be working with Miron Construction on a new water utility garage in Stevens Point, Wis. This total precast structure features our architectural wall panels with multiple finishes and double tees.

The first floor of wall panels has been erected, and the first floor of double tees is being installed. Each Double Tee is 100 feet long, allowing for wide column-free space below.

(Photos courtesy of Miron Construction.)